Bathroom renovation with timber-look tiles

Planning a bathroom renovation in Broome

A bathroom renovation is one of the best upgrades you can make to a Broome home, if it's planned properly. Here's how the process works from first idea to final grout line.

1. Decide what you're changing

Start by deciding whether you're doing a retile (new tiles and waterproofing, keeping the layout) or a full renovation (moving the shower, vanity or toilet). Keeping plumbing where it is keeps the cost and timeline down; moving it means a plumber and possibly changes to the floor.

2. What affects the cost

Every bathroom is different, so a fixed quote after an on-site measure is the only reliable number. The main things that drive the price are:

  • Size of the room and how much floor and wall area is tiled
  • Demolition: how many layers of old tiles and screed need to come out
  • Floor preparation: re-screeding for correct falls to the waste
  • Waterproofing to AS 3740, including the shower and floor
  • Tile choice: large-format, mosaics, patterns and natural stone take longer to lay
  • Features: shower niches, hobless showers, linear drains and feature walls
  • Other trades: plumbing, electrical, glazing and cabinetry

3. Choose tiles that suit the climate

For floors, choose slip-resistant porcelain (P3 or higher in the shower) in a mid-tone that hides red dust. Large-format wall tiles mean fewer grout lines to clean in humid weather. Our guide to the best tiles for Broome's climate covers this in detail.

4. Waterproofing is the most important step

You'll never see it once the tiles are down, but waterproofing decides whether your bathroom lasts. Insist on a membrane applied to the Australian Standard and a waterproofing certificate at the end. Read what waterproofing to AS 3740 means.

5. Typical timeline

  1. Strip-out: removing tiles, screed and fixtures (about 1 day)
  2. Rough-in: plumbing and electrical changes, if any
  3. Screeding: floor levelled with correct falls
  4. Waterproofing: membrane applied and allowed to cure
  5. Tiling and grouting: floors, walls, niches and trims
  6. Fit-off: vanity, tapware, screens and silicone

The tiling-related work for a full bathroom usually takes 5 to 8 working days, plus time for the other trades.

6. Questions to ask your tiler

  • Is the quote itemised, and what's included (demolition, disposal, waterproofing, grout, silicone)?
  • Will I receive a waterproofing certificate?
  • How will you make sure the floor falls to the waste?
  • Can you help me choose and supply tiles?
  • How will you protect the rest of the house and keep the site clean?

Ready to start? See our bathroom renovation service or request a free quote.